SITE OFFLINE: Currently in the deep interior conducting primary route verification for the November 2026 Sahara Transit.
Safety & Risk Management: BS 8848 Compliant (British Standard for Overseas Ventures).
Technical Authority: BORDA High-Level Professional (Advanced Technical Recovery).
Field Infrastructure: Starlink High-Speed Data and Satellite Voice Redundancy.
Logistics Network: Established Tribal and Local Agency Networks across the Sahara Interior.
Track Record: London-Dakar 300tdi Finisher | Unsupported 4x4 Transcontinental History.
Scout’s Note: "Field Record: Route Verification at the Niger-Libya Interface. Operational logistics for the November 2026 transit require precise sector knowledge and managed entry points."